A COMPOSITE COST-TIME TRADE-OFF MODEL FOR MULTI-STOREY PROJECT FAST TRACKING

Author(s):

  • Paul Amaechi Ozor (University of Johannesburg)
  • Charles Mbohwa (University of Johannesburg)
Full PDF
Abstract:
Whilst enormous research effort in project fast-tracking determine the efficacy of specific methods and policies that would guarantee strict compliance with project programs, less have been reported on combining existing models for improved performance opportunities. In this paper, the task of presenting a composite model for large project cost-time trade-offs and duration fast-tracking is undertaken. The methodological procedures followed in formulating the models were carefully delineated and the proposed models validated using a real-life example. The optimal crash time obtained was in total acquiescence with all the problem constraints. The results show that a composite project crashing model can be very useful in achieving optimal values of important variables regarding fast-tracking.
Download full PDF
@inproceedings{oscm-2019-445,
  title={A COMPOSITE COST-TIME TRADE-OFF MODEL FOR MULTI-STOREY PROJECT FAST TRACKING},
  year={2019},
  author={Paul Amaechi Ozor and Charles Mbohwa},
  booktitle={Proceedings of the 9th International Conference on Operations and Supply Chain Management, Vietnam, 2019},
  doi={10.31387/oscm410235}
}
Paul Amaechi Ozor, Charles Mbohwa (2019). A COMPOSITE COST-TIME TRADE-OFF MODEL FOR MULTI-STOREY PROJECT FAST TRACKING. In Proceedings of the 9th International Conference on Operations and Supply Chain Management, Vietnam, 2019. https://doi.org/10.31387/oscm410235